482 research outputs found
Exploring the Potential of Digital Twins for Production Control & Monitoring
The achievement of a high level of logistical performance is a primary goal of manufacturing companies. In order to remain competitive, companies must constantly improve order processing to ensure short delivery times and high delivery reliability. Production planning and control is a core function of manufacturing companies and is responsible for routing production orders through the stations involved in order processing such as procurement, production and dispatch. Yet managing production efficiently and achieving a high logistical performance remains a genuine issue, even with increasingly digitalized and automated processes. The concept of the digital twin promises an improved database to enable companies to reach more informed decisions. As yet, the potential for utilizing this database has not been thoroughly explored in the context of a constant measurement of the backlog and output. In addition, there are various divergent definitions and approaches to the application of digital twins. This paper discusses the potentials of the different tasks of production control and monitoring in relation to the acquisition of dynamic data in real-time. A method is provided that continuously calculates the backlog and output. Furthermore, an example of application is presented that shows how this information can be used for production control. Our results indicate that by exploiting this information, logistic performance can be improved
Маркшейдерське забезпечення робіт при створенні програмного модуля розкритих, підготовлених і готових до видобування балансово-промислових запасів
Розглянуто і досліджено методи визначення і нормування балансово-промислових запасів за ступенем підготовленості до видобування, які призначені для залізорудних корисних копалин і вугілля. Для багатьох видів твердих корисних копалин такі методи не розроблені. Встановлено, що кожний із видів мінеральної сировини має особливості природно-просторового розміщення у надрах, гірничо-технологічні стадії видобутку і переробки, які
враховують при підземному способі видобутку, методи визначення стану і рухомості, обліку і нормування підготовленості балансово-промислових запасів за програмним модулем
Accurate Time Domain Zero Voltage Switching Analysis of a Dual Active Bridge with Triple Phase Shift
Highly Dynamic Voltage Control of a Dual Active Bridge over the Full Voltage Range by Operating Point Dependent Manipulated Variable Limitation
This paper presents a highly dynamic voltage control for the Dual Active Bridge over the full operating range. Maximum dynamics is achieved by using the maximum available manipulated variable in combination with a feedforward control of the capacitor current at a setpoint change. Operation within the system limits is ensured by a variable limitation of the manipulated variable considering the current operating point. The simulation results are validated by measurements on a 35 kW Dual Active Bridge test bench
Loss Estimation of a Dual Active Bridge as part of a Solid State Transformer using Frequency Domain Modelling
This paper proposes an improved method for the loss estimation of a Dual Active Bridge (DAB) using frequency domain modelling. The method uses a detailed, frequency depending transformer model to describe even highly utilized DABs. The model is used to estimate the occurring losses of a DAB as part of an modular Solid State Transformer (SST). The influence of the SST\u27s phase power ripple is considered for the loss estimation. The results of the frequency domain model and the loss calculation are validated using measurement data of an SST-cell prototype
- …